It has been forever since I have posted updated pictures of our remodel, so here they are. The drywaller is coming this week and Michael is hoping to put primer on the walls this weekend *fingers crossed*. After that they will be ready to paint. The cabinets are in and we ordered the flooring for the kitchen last week so that should be here next week sometime. Once we get it painted we can put the cabinets in and the appliances (which should be here the second week of April). Then we can do the flooring and hopefully keep it moving along. I will leave you with these pictures and will try to update Brocks room in a seperate post, his pretty much looks like what these pictures show (drywall that needs to be finished).
| View looking in from the garage entry door |
| View from hall where laundry room/ 2nd bathroom are |
| Standing at the back door view- The hallway entrance was moved down to allow for more room for a kitchen table since we replaced the window with sliding doors |
| Kitchen- We have a new door that will replace that old wooden one |
| Add caption |
| View from front door |
| another view of the stairs going down to the basement and the livingroom window/ front door |


No comments:
Post a Comment